Sierra College
Project: Gym Modernization (72,000 SF)
Current Phase: Construction Documentation
Personal responsibilities: 3D Renderings + 3D modeling and interior design (Interior finishes, lighting, casework, entourage placement, composition, rendering and post-processing), 3D Flythrough video, Construction documents
Software used: Revit 2020, Enscape, Photoshop
Weight and Cardio Lab - 1
Weight and Cardio Lab - 2
Weight and Cardio Lab - 3
Climbing Wall - Anchor Point (A)
Climbing Wall - Adaptive Panel (B)
Anchor Points (A) placed at varying heights and lengths on host wall
Adaptive Panels (B) placed at each Anchor Point (A)
Climbing Holds (C) placed on panels
Climbing Wall in place
Overall Floor Plan - Weight and Cardio lab is located in the top left corner
Entrance Corridor modeled
Entrance Wall Graphic (Photoshop)
Entrance - Rendered Perspective
Gymnasium
Weight and Cardio Lab